Project: TerryS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Terry Shortt   -  
Project:   Vans   -   VIEW REPORTS
Total Hours:3267.7
Total Flight Time:
Total Expense:N/A
Start/Last Date:Sep 12, 2019 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=TerryS

Home or Last Project Picture

Aug 31, 2023     oil door - (4 hours)       Category: Fuselage
As I mentioned previously, the fiberglass oil door provided in the kit is too thick to sit flush in the recess cast into the factory cowl. I can think of several ways to fix this, but ultimately the simplest seemed like it would be to just make a thinner door out of aluminum.

I cut a new door out of .032 from my scrap pile, hand formed it to the correct contour, and match drill to the hidden hinge I had previously bought from somebody on VAF.

Once I was sure it was going to work, I made a paper template for the cutout shape needed for the Harrell latches I ordered from Wicks, and then spend an hour or so trimming and filing them to shape.

I built a strike plate to go on the latch side, and will bond it on the next time I mix up a batch of epoxy. I'll also need to fill in the gaps around the edge of the door with some micro for a nice flush fit


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.